Drive rivets not.
Drive rivets sunsetter awning.
Using a helper raise awning so that arms are vertical and roller tube is approximately the same elevation as the awning rail.
Go to step 6 at this point.
Replaces older style cumbersome hard to operate rv awning handle.
Dometic 3104653 005 bottom mounting bracket.
9100 series a e awnings come at around the same price as a manual awning but they are electric.
Drive assembly out of the tube and remove any burrs or.
Swing the arm back towards the house and latch the bottom of the arm into the wall bracket.
If the rivets are corroded put some lubricant on the rivets then tap the rivets one by one to loosen them up.
Faulkner rv awning replacement parts.
Separate the drive unit from the ends of the rafter and arm.
Special discount for rvgeeks viewers.
Test the awning for proper operation.
The part number for the motor assembly is 331 042 3.
Necessary the left hand must be pinned or the frta.
Extend lower part of arm so that awning is same height as awning rail using the operating handles and rest awning on ground.
The best dometic awning parts are.
We are here to help.
Remove the bolts screws or rivets depending on your awning model holding your end cap in place.
See section c step 1 paragraphs a and b.
Please press the contact.
Dometic a e 9100 power awnings come equipped with the vinyl fabric of your color choice and also a polar white colored weathershield so that all those harmful uv rays from the sun and damaging winds and rains won t prevent you from having an awning any more.
Move to end of vehicle from which awning is to be installed.
Dometic 143002p051 3 16 x 1 1 8 semi tube rivet pack of 2.
On the right end using a small nail or punch drive the centers of the three rivets all the way thru into the roller.
Will unroll and the spring tension will be lost.
You will need new rivets to replace the old ones after you drill them out.
Using a hammer and punch drive the pins flat with the head of the rivets.
Operate the lift handle and slide the inner arm back into the outer arm until it stops on the acorn nut.
After loosening the corrosion that binds the rivets to the metal of the rv awning drill the rivets out one by one.
Lift handle new 59 56 free shipping.
You can find a rivet gun and rivets at your local hardware store remove the cap and spring assembly.
Rivets that secure the end cap to the roller tube.